Category: 3. Beyond the project

  • HL-LHC Book Review | CERN Courier

    HL-LHC Book Review | CERN Courier

    Read the review in the CERN Courier about the second edition of The High-Luminosity Large Hadron Collider published in the first half of 2024.

    Explore →

  • Updated schedule for CERN’s accelerators

    Updated schedule for CERN’s accelerators

    The timing duration of the third long shutdown (LS3) of the Large Hadron Collider and injector complex has changed, here’s why.

    Explore →

  • Upgrading the LHCb sub-detectors for the HL-LHC

    Upgrading the LHCb sub-detectors for the HL-LHC

    The LHCb experiment is revamping its electromagnetic calorimeter with new high-performance modules and equipping its ring-imaging Cherenkov detectors with very fast electronics, 

    Explore →

  • Chamonix: building on success, planning for the future

    Chamonix: building on success, planning for the future

    As the HL-LHC project moves into full series production, the technical challenges associated with magnets, cold powering and crab cavities are being addressed.

    Explore →

  • A new generation of iron-dominated electromagnets has been successfully tested at CERN

    A new generation of iron-dominated electromagnets has been successfully tested at CERN

    Many physics experiments at CERN require moderate magnetic fields (around 2 tesla) in a large gap over a large volume.

    Explore →

  • Kicking off

    Kicking off

    By Kristiane Bernhard-Novotny – Following the installation of kicker magnets that are more heat resistant and their successful tests during the SPS scrubbing run, the SPS is getting ready for High-Luminosity LHC operation, CERN Bulletin.

    Explore →

  • News from the Chamonix workshop

    News from the Chamonix workshop

    News from the Chamonix workshop | home.cern By Mike Lamont (CERN) on home.cern There has been sustained international effort and good progress on the HL-LHC magnet front. The production of the interaction region magnets is progressing well, and prototyping and production of the NbTi magnets have passed through critical phases. The INFN twin aperture D2

    Explore →

  • ATLAS and CMS prepare for Phase II

    ATLAS and CMS prepare for Phase II

    The ambitious Phase II upgrades of the ATLAS and CMS detectors, necessary to deal with the tenfold increase in data to be delivered by the High-Luminosity LHC…

    Explore →

  • Building 180’s metamorphosis

    Building 180’s metamorphosis

    The renovation that was completed in 2022 has transformed the appearance of CERN’s second-biggest building in terms of surface area while also improving its energy performance

    Explore →

  • CERN designed High Efficiency klystron successfully tested

    CERN designed High Efficiency klystron successfully tested

    CERN designed High Efficiency klystron successfully tested By Frank Gerigk, RF Group Leader Last week there was for the first time a successful factory test of the CERN designed High Efficiency klystron. The goal was to increase the efficiency and output power of an existing 6 MW, 12 GHz klystron (Canon E37113), used in one

    Explore →