Tag: Collaboration

  • Important quench protection systems delivered

    Important quench protection systems delivered

    Important quench protection systems delivered With the delivery of the final units of the energy extraction system and quench heater power supplies in the last few months, an important part of quench protection for the High-Luminosity LHC has been produced and delivered, and focus is onwards to the remaining systems, tests and installations.  By Bozhidar

    Explore →

  • Beam Gas Curtain collaboration awarded the Faraday Cup

    Beam Gas Curtain collaboration awarded the Faraday Cup

    Beam Gas Curtain collaboration awarded the Faraday Cup The teams behind the Beam Gas Curtain have been awarded the main international award for innovation in production of operational beam instrumentation.  By Ray Veness (CERN) For the last 10 years, HiLumi LHC Work Package 13 – responsible for Beam Instrumentation – has been working with The

    Explore →

  • 16th High-Luminosity LHC Collaboration Meeting: a strong collaboration moving into deployment

    16th High-Luminosity LHC Collaboration Meeting: a strong collaboration moving into deployment

    16th High-Luminosity LHC Collaboration Meeting: a strong collaboration moving into deployment As the project moves into large-scale deployment this meeting demonstrated the readiness achieved across the collaboration and CERN for the coming years, and was an important step towards the next chapter.  By Markus Zerlauth (CERN) The 16th High-Luminosity (HiLumi) LHC Collaboration Meeting, kindly hosted by

    Explore →

  • Read the 10th HiLumi LHC annual newsletter!

    Read the 10th HiLumi LHC annual newsletter!

    The 10th edition of the annual newsletter has been released. Read it here!

    Explore →

  • Completion of DFX and DFM cryostats for the HiLumi LHC Cold Powering Systems

    Completion of DFX and DFM cryostats for the HiLumi LHC Cold Powering Systems

    In January 2026, CERN and the University of Southampton (SOTON) celebrated the successful completion of the series production of the DFX and DFH cryostats for the High-Luminosity LHC (HiLumi LHC) Cold Powering Systems.

    Explore →

  • Beam gas curtain monitor becomes an operational instrument for CERN’s Large Hadron Collider | Accelerating News

    Beam gas curtain monitor becomes an operational instrument for CERN’s Large Hadron Collider | Accelerating News

    By Hao Zhang (Cockcroft Institute/University of Liverpool) on Accelerating News Following a positive evaluation during a review of transverse beam profile monitoring for the HiLumi LHC in September 2025, in February 2026 the BGC monitor was approved as an important addition to the beam instrumentation baseline for the HiLumi era. “It’s a huge success and

    Explore →

  • First series RFD crab cavity on the road to cryomodule assembly

    First series RFD crab cavity on the road to cryomodule assembly

    The first dressed series RF dipole crab cavity, RFD02, has been successfully delivered to TRIUMF, Canada, from JLAB, USA. This begins the cavity’s journey towards cryostating, when it will be integrated – along with the second dressed series cavity expected to arrive still in the first half of 2026 – into the first series cryomodule.

    Explore →

  • Half of the US-AUP magnet production at CERN

    Half of the US-AUP magnet production at CERN

    At the end of October we received two more magnets from Fermilab (CA03 and CA05). With these deliveries, half of the units from the US are at CERN! They join the other three magnets already received: CA01 and CA02 for the IT String, and CA04.

    Explore →

  • All bare DQW crab cavities produced and qualified

    All bare DQW crab cavities produced and qualified

    Following etching and most-recent tests of the final 6 bare DQW crab cavities delivered to CERN earlier this year, the whole DQW series has been qualified.

    Explore →

  • All components for the Cold Powering Systems of the HL-LHC now at CERN

    All components for the Cold Powering Systems of the HL-LHC now at CERN

    At the end of October 2025, ICAS delivered to CERN the last of the ten complex MgB₂ cable assemblies needed for the Superconducting Links of the Cold Powering Systems that will be used for connecting the magnets to the power converters in the HL-LHC.

    Explore →