Tag: WP15 – Integration and (De-)Installation

  • Exceptional transport operations to make way for HiLumi LHC | home.cern

    Exceptional transport operations to make way for HiLumi LHC | home.cern

    Exceptional transport operations to make way for HiLumi LHC | home.cern The first two massive components of the LHC have been removed from the accelerator tunnel following a complex handling operation By Corinne Pralavorio on home.cern A complex operation has just taken place with the removal of the first massive pieces of equipment from the

    Explore →

  • Read the 10th HiLumi LHC annual newsletter!

    Read the 10th HiLumi LHC annual newsletter!

    The 10th edition of the annual newsletter has been released. Read it here!

    Explore →

  • HL-LHC infrastructure and installations: 2024 progress setting us up for 2025

    HL-LHC infrastructure and installations: 2024 progress setting us up for 2025

    2024 was a challenging yet fruitful year for logistics and installation of the general services of the new HL-LHC galleries at CERN Points 1 and 5. 2025 will be a key year for the HL-LHC

    Explore →

  • Updated schedule for CERN’s accelerators

    Updated schedule for CERN’s accelerators

    The timing duration of the third long shutdown (LS3) of the Large Hadron Collider and injector complex has changed, here’s why.

    Explore →

  • LS3 schedule change

    LS3 schedule change Since the publication of this article, there has been a change to this schedule. Click here to view the updated schedule.  LHC / HL-LHC Plan: link Following the recommendations of both the LHCC (LHC Experiments Committee) and the CMAC (CERN Machine Advisory Committee), a change to the LHC schedule was presented by CERN management to Council and

    Explore →

  • A new schedule for the LHC and its successor

    A new schedule for the LHC and its successor The LHC will restart in May 2021 and Run 3 will be extended by one year. Read on home.cern Read more news

    Explore →