Tag: WP19 – Alignment and Internal Metrology
-

Robot to mark the way: robotic tracing to support HL-LHC installation
The CERN Survey team (BE-GM-ASG) took a major step towards modernising how floor markings are performed in the LHC tunnel, with the introduction of the HP Site Print tracing robot. This new solution will play a key role in preparing for the installation of HL-LHC components.
-

First jacks for the HL-LHC IT String delivered
After the successful validation of four jacks from the first batch produced by UNIOR components d.o.o in Serbia, the second batch of the pre-series production (in total, 19 units) destined for installation in the IT String, has successfully passed the Site Acceptance Tests at the EN-MME main workshop, performed in close collaboration with BE-GM.
-

Production of the first HL-LHC jacks units in Serbia
Production of the first HL-LHC jacks units in Serbia By Prof. Peter Adzic and Beniamino di Girolamo Validation loading tests for the first HL-LHC jacks produced by UNIOR components d.o.o, a Serbian Company. They are part of an order for nineteen longitudinal jacks and four central jacks that will be used to support the magnets in
-
Aligning the HL-LHC magnets with interferometry
Aligning the HL-LHC magnets with interferometry CERN surveyors have just finalised a system that can determine, in real time, the position of certain components inside the (sealed) cryostats of the future High-Luminosity LHC (HL-LHC). Read more Read more news





