Tag: WP7 – Machine Protection and Availability
-

Important quench protection systems delivered
Important quench protection systems delivered With the delivery of the final units of the energy extraction system and quench heater power supplies in the last few months, an important part of quench protection for the High-Luminosity LHC has been produced and delivered, and focus is onwards to the remaining systems, tests and installations. By Bozhidar
-

HL-LHC Magnet Circuit Instrumentation Day 2023
ollowing the HL-LHC Circuit Instrumentation Detailed Design Review held in September 2020, the HL-LHC Magnet Circuit Instrumentation Day 2023 successfully took place on the 20th of June 2023 in the Kjell Johnsen Auditorium at CERN as an in-person meeting.
-

Cold diodes for the inner triplet circuit of the High Luminosity LHC
Cold diodes for the inner triplet circuit of the High Luminosity LHC By Daniel Wollmann (CERN) in Accelerating News The cold diodes of the new triplet circuits will be installed in a dedicated cryostat in the LHC tunnel downstream of the triplet magnets and close to the LHC beam pipe. Read more in Accelerating News | Issue





