SC Link transport tests in the SM-18

SC Link transport tests in the SM-18

SC Link transport tests

SC Link transport tests

On 9 March 2021, transport tests were performed on the |120| kA (2 *60 kA) MgB2 flexible prototype electrical transfer line (SC Link), designed for the powering of the HL-LHC triplets.

The transport tests were carried out at CERN, in the SM-18 facility.

By A. Ballarino, WP6A Leader.

Related photos (link) and video (link).