Category: 1. Project News

  • First civil-engineering milestone passed for the High-Luminosity LHC

    First civil-engineering milestone passed for the High-Luminosity LHC Excavation of the two new shafts for the HL-LHC at points 1 and 5 of the accelerator has been completed, CERN Bulletin. A montage of three photos showing an excavator in one of the two shafts that were dug for the High-Luminosity LHC (Images: © Antonino Panté, antoninopante.com.

    Explore →

  • A delicate maneuver

    A delicate maneuver The WP8 team successfully extracted the JTT from the ATLAS detector on 11 January! Read more news

    Explore →

  • The year of the crab

    The year of the crab Tests carried out in 2018 on two crab cavities in the SPS validated their technical principle and many operating parameters, CERN Bulletin. Read more news

    Explore →

  • A new step for High-Luminosity LHC

    A new step for High-Luminosity LHC During a public visit, the HL-LHC collaborators saw the progress on the civil engineering works, where in that moment the excavations had reached 30 metres at Point 1 and 25 metres at Point 5, Accelerating News | Issue #27. Read more news

    Explore →

  • Load test in SX1

    Load test in SX1 A ‘loaded’ start to the year for HiLumi. Before the JTT extraction next week in the ATLAS cavern, a WP8 team performs load tests (18.4 tons) in the SX1. Read more news

    Explore →

  • QUACO cited by the European Commission as a successful Horizon 2020 project

    QUACO cited by the European Commission as a successful Horizon 2020 project Unique magnets to supercharge the world’s largest particle accelerator, European Commission website. Read more news

    Explore →

  • A brand-new beam screen to cope with high luminosity

    A brand-new beam screen to cope with high luminosity The beam screen for the High-Luminosity LHC will be installed by 2024 in the aperture of the inner triplet superconducting magnets near ATLAS and CMS. Read more Photos on CDS Read more news

    Explore →

  • Opening the HRMT-45 module by means of a robot

    Opening the HRMT-45 module by means of a robot After having undergone several high intensity beam impacts at the HiRadMat facility in August, the TDIS HRMT-45 module was disassembled in November by the EN/STI-TCD and EN/SMM-MRO teams in the bunker 867-R-P58 for the post-irradiation analysis. The ultimate goal is to verify that all the equipment

    Explore →

  • More powerful protectors for higher luminosity

    More powerful protectors for higher luminosity An important protection component for the High-Luminosity LHC has been successfully tested at the HiRadMat facility By Cristina Agrigoroae At the end of August this year, as the summer was taking its time to fade away, a component for the High-Luminosity LHC’s army of protectors was successfully tested.  The

    Explore →

  • Halfway to high luminosity

    Halfway to high luminosity The High-Luminosity LHC has reached its halfway point. The second-generation LHC project was launched eight years ago and is scheduled to start up in 2026, eight years from now. Read update on home.cern Read CERN Courier article Read more news

    Explore →