The new metallic structure, installed in SM18, will be part of the IT String Test Stand. It will house the main components of the HL-LHC powering systems, due for arrival at the end of 2022, Accelerating News.
Photo collection: link.
The new metallic structure, installed in SM18, will be part of the IT String Test Stand. It will house the main components of the HL-LHC powering systems, due for arrival at the end of 2022, Accelerating News.
Photo collection: link.