Skip to main content

CERN Accelerating science

    • Sign in
  • Directory
home
High Luminosity LHC Project

Main navigation

  • Home
  • About
    • The project
    • Collaboration Institutes
    • International Contributions
    • Relations with Industry
    • Related projects
  • Structure
  • media
    • Animations
    • Videos
    • Photos
    • HiLumi 3D
    • Knowing HiLumiers
    • Outreach
    • HLCB Newsletter
    • Accelerating News
  • Intranet
  • search

HTS

Final resistive parts of current leads for HL-LHC cold powering systems completed at CERN

By Amalia Ballarino (CERN)

The final resistive parts for the current leads for HL-LHC Cold Powering Systems are completed, meaning that the full series of 157 units is available! 

cold powering, HTS, WP6a
03/04/2025

Final resistive parts of current leads for HL...

cold powering, HTS, WP6a
03/04/2025

Demo 3, a new successful milestone for the WP6A team

LHC, HL-LHC, High-Luminosity, superconductivity, cold powering, HTS
11/12/2020

Demo 3, a new successful milestone for the WP...

LHC, HL-LHC, High-Luminosity, superconductivity, cold powering, HTS
11/12/2020

Follow Us

W M 1  

DOCUMENTS

  • Logo
  • Graphic charter
  • Preliminary Design Report
  • Technical Design Report 2020

HILUMI LHC EC FP7 DESIGN STUDY

  • Website (archived)

QUACO PROJECT

  • Website

Useful links (members only)

  • HiLumi Calendar
  • HiLumi Intranet
  • Presentation templates
  • Publication guidelines
CERN
Copyright  © 2025 CERN